Power Optimization of Electric Developments in Diesel Power Plant for the Electrical Energy Sources using Dynamic Programming Algorithm
Keywords:
Photovoltaics, Solar Energy, Five Parameters Model, Monocrystalline, PolycrystallineAbstract
The electricity demand in the G4 Building at the State University of Malang exceeds 85 kVA. Under normal conditions, all electrical devices can be operated; however, when the primary energy source is unavailable, the building’s electricity supply is transferred to the diesel power plant (DPP). Since the DPP has a limited capacity of only 20 kVA, it is necessary to optimize the electrical load so that the available energy can be utilized effectively. This optimization was achieved through room scheduling and an electrical device priority system. A Dynamic Programming Algorithm was embedded in the power optimization system to support this process. The prototype was designed to simulate the conditions of the first floor of the G4 Building. The system consisted of three main components: a controller, a central controller, and a user interface. The controller included a current sensor, microcontroller, and relay. The central controller was built using Raspberry Pi 3 hardware, functioning as a server to process HTTP requests from both the controller and the user interface. The user interface was a dynamic web application that let users manage electrical devices and enter room-usage schedules. The optimization system managed the limited DPP energy by activating electrical devices according to their assigned priority values. Testing of the system involved six problem scenarios, each of which resulted in an error value of 0%.Therefore, the development of solar power plants in coastal areas such as Sendang Biru Beach could help reduce electricity costs while promoting the use of renewable energy.




