Vol. 25 No. 2 (2020)

Published: 2020-10-31

Articles

  • ANALISA MODEL HIDROGRAF BANJIR KALI NGOTOK DENGAN METODE SCS, SNYDER DAN NAKAYASU

    Gilang Id'fi
    1-10
    DOI: https://doi.org/10.17977/um071v25i22020p1-10
  • PREDIKSI PRODUKTIFITAS KERJA PADA PEKERJAAN TANAH DAN PONDASI BANGUNAN TAK BERTINGKAT

    Sugiyanto Sugiyanto, Made Wena
    11-24
    DOI: https://doi.org/10.17977/um071v25i22020p11-24
  • ANALISIS KINERJA RUAS JALAN RAYA SINGOSARI KABUPATEN MALANG

    Agustina P F Seran, Sugiyanto Sugiyanto, Pranoto Pranoto
    25-38
    DOI: https://doi.org/10.17977/um071v25i22020p25-38
  • IMPLEMENTASI SISTEM MANAJEMEN K3 PADA PROYEK PEMBANGUNAN GKB UNIVERSITAS NEGERI MALANG

    Lenny Novitasari, Suparno Suparno, Boedi Rahardjo
    39-48
    DOI: https://doi.org/10.17977/um071v25i22020p39-48
  • ANALISIS TITIK KEMACETAN DARI TERMINAL ARJOSARI KE TERMINAL GADANG BERDASARKAN TRAYEK ANGKUTAN KOTA AG MENGGUNAKAN SIG

    Fitris Dyah Astiti, Titi Rahayuningsih, Pranoto Pranoto
    49-60
    DOI: https://doi.org/10.17977/um071v25i22020p49-60